Case Study: Commercial Solar Installation Reducing Operational Energy Costs
This case study looks at a commercial solar system installed to lower energy costs for a factory. It also aims to make the facility more stable against power outages. We compare it to other big solar projects in Canada, like Otter Energy’s 1.58 MW array for Schutz Canada in Belleville.
That project was expected to save $12,567,428 over its lifetime, with a 31.10% return on investment. It would pay for itself in 3.5 years and cut down on 528,300 kg of CO2 emissions yearly.